2 Followers
24 Following
powergrid

Wholesale pure sine wave inverter

It is a modern, new type enterprise integrating R&D, design, production, sales and service.Wholesale pure sine wave inverter

China power inverter Suppliers sub stations

 

  The Delhi Transco Ltd, however, denied the charges." DMRC draws power through a number of substations of DTL. If some momentary problem occurs at one source DMRC should draw power from other source and also overcome shortcomings in its network" said DTL spokesperson.The problem began with power tripping at Sarita Vihar China power inverter Suppliers sub stations at 8.11 am and immediately supply was restored from Faridabad sub station which also tripped at 8.28 am. Supply tripped at both the sub stations thrice each, intermittently, affecting the train movement.To tackle the situation, power supply was restored from IP Extension sub station but it also tripped for five minutes at 8.25 am. Finally power supply was restored at Faridabad sub station at 9.42 am and situation normalised at 9.49 am. For three minutes, between 8.25 am to 8.28 am, there was no power available, said the official.Metro services in the recent past have been hit due to one or another reason.

  A power supply snag hit the Yellow Line, delaying train movement along the North-South corridor on Monday. DMRC has lodged a case against a telecom company in this regard for snapping a power line.The Blue Line connecting Dwarka Sector 21 to Noida City Centre and Vaishali is often affected by snags related to signalling problems. "Line 3 is more prone to failures due to a different signalling system used by us," Mr Sharma said.Office goers had a hard time as they were stranded in the trains as well as on stations as train services remained affected for around two hours. "In normal cases of tripping at any sub station, power supply is restored from another one but in this particular case the situation was difficult due to tripping of power supply at three sub stations intermittently," Mr Sharma said.

  Kolkata: There was wide-spread load-shedding in the city on Thursday morning after the tripping of three CESC units based in Budge Budge, crippling Metro services.Taking serious note of the power disruption with the Madhyamik examination going on in the state, chief minister Mamata Banerjee asked the power department to take all possible measures to ensure that there was no inconvenience caused because of power disruptions to those taking the Madhyamik examination.Several Madhyamik examinees, who were on their way to appear for their second language examination, were stranded in different Metro stations, and even in a rake that was stuck between Belgachia and Shyambazar Metro tunnel for nearly three minutes."It was so suffocating. The Metro went completely dark inside the tunnel. However, the Metro authorities somehow managed to get the train to slowly roll to Shyambazar after three minutes. We were all perspiring profusely," Riten Sardar, a Madhyamik examinee said.